Precautions - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal (non-mitsubishi electric products 2)
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

10.3.6

Precautions

■1. When setting IP address
Do not use "0" and "255" at the end of an IP address.
(Numbers of *.*.*.0 and *.*.*.255 are used by the system.)
The GOT may not monitor the controller correctly with the above numbers.
Consult with the administrator of the network before setting an IP address to the GOT and controller.
■2. When connecting to multiple GOTs
(1) Setting Station
When connecting two or more GOTs in the Ethernet network, set each [Station] to the GOT.
10.3.4 ■4. Connected Ethernet Controller Setting
(2) Setting IP address
Do not use the IP address "192.168.0.18" when using multiple GOTs with the GOT 1000 series mixed.
A communication error may occur on the GOT with the IP address.
■3. When connecting to the multiple network equipment (including GOT) in a segment
By increasing the network load, the transmission speed between the GOT and PLC may be reduced.
The following actions may improve the communication performance.
• Using a switching hub
• More high speed by 100BASE-TX (100Mbps)Reduction of the monitoring points on GOT
■4. Tag name of AB native tag
When using the multiple AB native tags with long names, the monitor display speed may slow down.
For details, refer to the following manual.
GT Designer3 (GOT2000) Screen Design Manual
10.3 Ethernet Connection
10
10 - 31

Advertisement

Table of Contents
loading

Table of Contents