Mitsubishi Electric AE-200A Instruction Book page 97

Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

[5] Setting the closing date in "Closing date" screen
Either "End of month" or "Day (1-28) of each month" can be selected.
Procedures
1. First check the closing date with the building owner.
2. Set either [End of month] or [Day (1-28) of each month] as the closing date.
• If you select [End of month], the electric energy from the 1st of the month to the end of the month will be
displayed in the "Energy management list" on the AE-200's LCD.
• If you select [Day (1-28) of each month], the electric energy from the day after the closing date to the next
closing date will be displayed in the "Energy management list" on the AE-200's LCD.
Note
• Note that 29th, 30th or 31st cannot be set as the closing date for every month.
• There are two types of "Closing date": Closing date calculation (automatic output) "Set on the Charge
Calculation Tool"; or "Set on the Initial Setting Tool" shown in the energy management list on the AE-200
itself.
So that electric energy consumed by each tenant matches the electric energy consumption displayed in
the energy management list on the AE-200, set the same day as the closing date.
[6] Saving the settings
After the settings are completed, click [Save].
WT07442X02
97

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aEw-50aae-200eEw-50eAe-50e

Table of Contents