Mitsubishi Electric AE-200A Instruction Book page 17

Hide thumbs Also See for AE-200A:
Table of Contents

Advertisement

Note
• Calculations on the Charge Calculation Tool will be output for periods shorter than that covered by the data
stored in the AE-200 (maximum of the preceding 62 days).
4. In the Basic Settings screen, select [From AE-200 via LAN] as the apportioned data acquisition method.
5. AE-200 address input field
• Enter the IP address of the AE-200.
• If there are multiple AE-200 units, enter the IP addresses of all the AE-200 units.
• AE-50/EW-50 units within the AE-200 system do not need to be registered.
6. ID and password input fields
• Enter the ID and password set for the AE-200 for which you want to calculate charges.
• Enter the ID and password of the building manager for the AE-200.
7. Click [Start calculation].
The charge calculation results will be displayed. (Refer to section 3-4 "Displaying charge calculation
results".)
Note
• The settings in procedures 4 to 6 will be retained so if no changes are required, you don't need to make
the settings for the second time onwards.
• The apportioned data can be acquired from the day after the operation start day.
WT07442X02
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae-50aEw-50aae-200eEw-50eAe-50e

Table of Contents