26) Apply A/T fluid to 2nd brake piston assembly (1), and
align the projection of 2nd brake piston assembly
with the groove of transaxle case, then put together.
27) Install 2nd brake piston snap ring (1) by using
special tool and hydraulic press.
CAUTION
!
Do not damage 2nd brake piston assembly,
return spring subassembly, plates and discs
by pressing in 2nd brake assembly passing
through its original installing position over
0.4 mm (0.016 in.).
Special tool
(A): 09926–96050
28) After applying A/T fluid to front sun gear thrust
bearing race (2), install it to front planetary sun gear
(1).
Automatic Transmission/Transaxle:
29) Apply A/T fluid to front planetary sun gear (1) and
install it to planetary gear assembly (2).
I2RH0B510282-01
30) Install O/D and 2nd coast brake retaining plate snap
ring (1).
CAUTION
!
Be sure to install O/D and 2nd coast brake
retaining plate snap ring correctly in groove
of transaxle case.
31) After applying grease to slide contact face of
planetary carrier thrust washer (1), install it to
planetary gear assembly.
I2RH0B510283-01
"A": Grease 99000–25030 (SUZUKI Super
Grease C)
I2RH0B510285-01
5A-155
I2RH0B510286-01
I2RH0B510287-01
I2RH0B510288-01