Installation Guidelines - Cisco Catalyst 2950 Hardware Installation Manual

Desktop switch
Hide thumbs Also See for Catalyst 2950:
Table of Contents

Advertisement

Chapter 3
Installation

Installation Guidelines

78-11157-05
When determining where to place the switch, observe these guidelines.
Before installing the switch, first verify that the switch is operational by
powering it on and running POST. Follow the procedures in the
Switch Operation" section on page
For 10/100 ports and 10/100/1000 ports, the cable length from a switch to an
attached device cannot exceed 328 feet (100 meters).
For 100BASE-FX ports, the cable length from a switch to an attached device
cannot exceed 6562 feet (2 kilometers).
For 1000BASE-SX ports and 1000BASE-SX Gigabit Interface Converter
(GBIC) module ports, the cable length from a switch to an attached device
cannot exceed 1804 feet (550 meters).
For 1000BASE-LX/LH GBIC module ports, the cable length from a switch to
an attached device cannot exceed 32,810 feet (10 kilometers).
For 1000BASE-ZX GBIC module ports, the cable length from a switch to an
attached device cannot exceed 328,100 feet (100 kilometers).
For 1000BASE-T GBIC module ports, the cable length from a switch to an
attached device cannot exceed 328 feet (100 meters).
For Coarse Wave Division Multiplexing (CWDM) GBIC module ports, the
cable length from a switch to an attached device cannot exceed 393,719 feet
(120 kilometers). For specific cable lengths, refer to the CWDM GBIC
module documentation.
For GigaStack GBIC module ports, the cable length from a switch to an
attached device cannot exceed 3 feet (1 meter).
For Long-Reach Ethernet (LRE) ports, cable-length specifications vary. See
the
"LRE Port" section on page
Operating environment is within the ranges listed in
Specifications."
Clearance to front and rear panels meet these conditions:
Front-panel LEDs can be easily read.
Access to ports is sufficient for unrestricted cabling.
Rear-panel AC power connector on switches other than the LRE switches
is within reach of an AC power outlet.
3-10.
2-12.
Catalyst 2950 Desktop Switch Hardware Installation Guide
Preparing for Installation
"Verifying
Appendix A, "Technical
3-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents