Chapter 6
Cabling the GBE Line Ports and Completing the Installation
How to Cable the GBE Line Interface Ports
Take the appropriate fiber optic cable (see
Step 1
and plug it into the appropriate port on the SPA module in slot #3 of the Cisco SCE8000 GBE. (See
Figure 6-2
Make sure to push on the connector until you hear a click, which indicates that the connector is fully
inserted and secured in the receptacle. Always make sure that you insert the connector completely into
the socket.
Figure 6-2
Verify that the link LED is green.
Step 2
If the link LED does not light, try removing the network cable plug and reinserting it firmly into the
module socket.
Cabling the Line Interface Ports: Using the External Optical Bypass Module
Refer to
External Optical Bypass Module line interfaces.
Figure 6-3
OL-19897-02
below.)
Cabling the GBE Line Interface
SP A -1 X1
0G E- L- V2
Optical Bypass Module Connectivity, page 6-5
External Optical Bypass Module Line Interfaces: SCE8000 GBE
B 2
C 2
B 2
C 2
SFP Module Cabling and Connection Equipment, page
for specific connectivity.
D 2
L 1
L 2
C T R L
D 2
L 1
L 2
C T R L
Cisco SCE8000 GBE Installation and Configuration Guide
Cabling the GBE Line Interface Ports
1
SP A -1 X1
0G E- L- V2
3
Figure 6-3
displays the
A
C
B
D
A
B
C
D
A
C
B
D
A
B
6-7)
6-9