CLI Commands to Verify a Successful Installation
Revised: August 23, 2010, OL-19897-02
Introduction
When you have completed the installation of your Cisco SCE8000 GBE platform, we recommend that
you run a number of CLI commands to verify that the proper components have been successfully
installed and are operational.
Basic Post-Installation Checklist
The following table provides a basic post-installation checklist with the related CLI commands. Further
verification of the system configuration would depend on the specific topology and configuration of the
installation, but this list will verify that the basic installation is operational.
Refer to the descriptions of the individual commands for samples of the command output. Relevant
information in the output is in bold.
To check this:
Use this command:
version
show version
optics
show inventory
port configuration
show interface
operational status
show system operational status
linecard status
show interface linecard
OL-19897-02
A P P E N D I X
Comments
Check the following:
firmware version
•
application version
•
management agent status
•
management agent version
•
In the physical inventory of the SCE platform, verify that the
installed optics are supported by the interfaces.
Run this command for each port to get a listing of the status
and configuration of all ports.
Status should be operational.
This command will give you an indication of problems such
as a power problem or external bypass not configured
properly.
It should not be shutdown or silent.