Required Tools; Installing The Chassis Brackets - Cisco SCE8000 GBE Installation And Configuration Manual

Hide thumbs Also See for SCE8000 GBE:
Table of Contents

Advertisement

Installing the Cisco SCE8000 GBE Chassis in the Rack

Required Tools

These tools and equipment are required to install the chassis in the rack:

Installing the Chassis Brackets

The chassis is shipped with the mounting brackets installed on the front of the chassis. These brackets
can be installed on the rear of the chassis.
To install the brackets on the rear of the chassis, perform these steps:
Remove the screws that secure the brackets to the chassis
Step 1
Figure 4-13
Step 2
Position one of the brackets against the chassis side, and align the screw holes.
Secure the bracket to the chassis with the screws removed in Step 1.
Step 3
Step 4
Repeat Steps 2 and 3 for the other bracket.
Cisco SCE8000 GBE Installation and Configuration Guide
4-16
Number 1 and number 2 Phillips screwdrivers
3/16-inch flat-blade screwdriver
Tape measure and level
Masking tape or some other method of marking the desired installation height in the rack
Brackets on Cisco SCE8000 GBE Chassis
FA N ST
SCE 8000
-SCM -E
AT US
1
SC M
OPT ICAL
BYP ASS
CON SOL
E
POR T 1
LINK /
10/10 0/
ACTI VE
1000
SC M
2
SCE 8000
-SIP
0
SIP
3
STA TUS
SCE 8000
SPA
INTE RFA
CE
PRO CES
SOR
2
A1
0
B1
4
C1
D1
SC E8 00
A2
Rx Tx
0- FA N
B2
A1
2
OP B-S
B1
CE 8K -2L
C1
-M M
D1
A2
Rx Tx
B2
OP B-S
CE 8K -2L
-M M
STA TUS
OPT ICA
L BYP ASS
SCE8 000
EXTE NDED
SERV ICE
CONT ROL
LINK /
10/10 0/
ACTI VE
1000
MA STE R
SYS TEM
POW ER
SPA- 1X10
GE-L -V2
1
SPA- 1X10
GE-L -V2
C2
D2
L1
A
C
L2
B
D
A1
C2
B1
D2
CT RL
3
A
C1
C
B
D
D1
L1
A
A2
B
C
Rx Tx
L2
D
B2
C2
A1
D2
OP B-S
CT RL
B1
CE 8K -2L
A
B
C1
-M M
L1
C
D
D1
A
OP8 8K-
C
A2
L2
B
D
Rx Tx
B2
C2
1
D2
CT RL
OP B-S
A
B
CE 8K -2L
C
L1
D
-M M
A
B
C
L2
D
3
CT RL
A
B
C
D
Chapter 4
Installing the Cisco SCE8000 GBE Chassis
(Figure
4-13).
MOD ULE
HD- EXT
-PN L
OL-19897-02

Advertisement

Table of Contents
loading

Table of Contents