Honeywell Apex Technical Handbook page 43

Gas detection system
Hide thumbs Also See for Apex:
Table of Contents

Advertisement

MAN0604_Issue 09_02-2013
2110M8030
Terminal number
SK4
1
(Comms
2
& Power)
3
Note: Three terminal blocks are provided, any two can be used.
1
2
3
3.3.6 Refitting the Transmitter Unit Top
(1)
Support the top.
Ensure that it is supported whilst the next step is carried out.
(2)
Reconnect to the Transmitter Unit base the wire retaining cable fitted between the top and
the base.
Fit and tighten the single M6 hexagon screw that secures the cable to the base. Tighten the
M6 screw to 3Nm (2.21 foot-pounds). Remove the support for the top and let the top down
gently until it is supported by the retaining cable.
(3)
Reconnect the ribbon cable into the ZIF connector on the Interconnect PCB in the base of the
Transmitter Unit.
Follow the reverse of the removal procedure ensuring that the ribbon is not twisted and is
correctly centred relative to the ZIF connector before insertion. Make sure that the ribbon
cable contacts face in the same direction as the arrow on the following diagram. Push the
latch on the connector down evenly until it is fully engaged.
3. inSTAllATiOn
Function
Min. length of cable from
NET1
NET2
Ground
SK4
entry point
60mm
60mm
60mm
43
Apex

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents