Hitachi CHROMASTER 5160 Instruction Manual page 722

Table of Contents

Advertisement

5.4
Assembling of Pre-heating Tubing (for Pre-heating of 0.5 Line or of More Than
1.5 Line)
(3)
With the tube set in the pre-heating base, re-attach the pre-
heating plate and fasten it with the two hexagon bolts.
NOTE: Before re-attaching the pre-heating plate, be sure
to make sure that the tube is neatly installed in the
grooves in the pre-heating base.
Re-attaching the pre-heating base with the tube
not properly set may damage the tubing or lead to
incorrect results.
Where a flow rate at lower than 0.7 mL/min is used, set the
tubing from the center of the pre-heating section as shown in
Appended Fig. 1-11 below (0.5 line).
Column connected
side
100 mm
Set the tubing from
the center.
Appended Fig. 1-11 Assembling of Tubing (for Pre-heating
APPENDIX 1 - 15
of 0.5 Line)

Advertisement

Table of Contents
loading

Table of Contents