Replacement Of Injection Port Seal - Hitachi CHROMASTER 5160 Instruction Manual

Table of Contents

Advertisement

5.3 Replacement of Injection Port Seal

The injection port seal should be replaced periodically every
about 10,000 sample injections as a standard.
Items to be prepared:
Injection port seal (P/N 893-0810)
Seal remover (P/N 893-2115)
(1)
Loosen the injection port with your hand. And remove it
from the injection valve.
Injection port
Injection valve
Fig. 5-1 Removal of Injection Port
(2)
Insert a seal remover into the injection port. And remove
an injection port seal.
Seal remover
Injection port
Injection port seal
Fig. 5-2
Removal of Injection Port Seal
5 - 4
Insert a seal remover into
the injection port.
Remove an injection port seal.

Advertisement

Table of Contents
loading

Table of Contents