8 OPR CONTROL
In the case of the absolute position system, use the PLC program to check the OPR request
before performing the positioning operation.
Failure to observe this could lead to an accident such as a collision.
!
REMARK
OPR request
The "OPR request flag" (
machine OPR must be executed in the following cases.
When the power is turned ON (in the case of the absolute position system, however,
the "OPR request flag" is not established.)
When the machine OPR has not been executed at the absolute position system
When the "absolute position lost" (
position system
When the "
Pr.114
When the machine OPR starts
The address information stored in the QD75MH cannot be guaranteed while the "OPR
request flag" is ON.
The "OPR request flag" turns OFF and the "OPR complete flag" (
turns ON if the machine OPR is executed and is completed normally.
CAUTION
Md.31
Status: b3) must be turned ON in the QD75MH, and a
Md.108
Rotation direction selection" is changed
8 - 3
MELSEC-Q
Status: b4) turns ON in the absolute
Md.31
Status: b4)