5
Installing the Walkway to the
Machine
Parts needed for this procedure:
1
Walkway
1
Pivot bracket
1
Cable
1
Pin
1
Grease fitting
3
Bolt (12 x 40 mm)
3
Locknut (12 mm)
1
Bolt (3/8 x 1 inch)
2
Washer (3/8 inch)
1
Locknut (3/8 inch)
1
Washer (13/16 inch)
Installing the Locking Pin and Cable on
the Walkway
1. Secure the cable to the outboard hole on the forward,
vertical flange of the walkway with a bolt (3/8 x 1
inch), 2 washers (3/8 inch), and a locknut (3/8 inch) as
shown in
Figure
14.
Note: Ensure that the cable is vertically aligned to the
flange of the walkway.
Figure 14
1. Washer (13/16 inch)
2. Locking pin
3. Cable
4. Bolt (3/8 x 1 inch)
2. Thread the split ring of the locking pin through the
loop in the cable
(Figure
5. Washer (3/8 inch)
6. Vertical flange of the
walkway
7. Locknut
14).
3. Slip the washer (13/16 inch) over the end of the locking
pin and past the spring-loaded ball
Installing the Walkway Pivot Bracket
1. Thread the grease fitting into the hole in the cylindrical
part of the pivot bracket
1. Pivot bracket
2. Hole for the grease fitting
3. Grease fitting
2. Align the holes in the pivot bracket with the holes in
the forward flange of the fuel tank
3. Loosely secure the bracket to the fuel tank with 3 bolts
(12 x 40 mm) and 3 locknuts (12 mm) as shown in
Figure
15.
Installing the Walkway
1. Align the pivot pin of the walkway with the hole in the
pivot bracket cylinder
1. Walkway support bracket
2. Horizontal flange of the
walkway
3. Locking pin
2. Fully seat the pivot pin into the cylinder
14
(Figure
14).
(Figure
15).
Figure 15
4. Flange-head bolt (12 x 40
mm)
5. Forward flange of the fuel
tank
6. Flange locknut (12 mm)
(Figure
15).
(Figure
16).
Figure 16
4. Pivot pin
5. Pivot bracket cylinder
(Figure
16).