Setup
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
1
2
3
4
5
6
7
8
Description
Cylinder
Prepare to install the attachment onto
-
the traction unit.
1
Install the backhoe wiring harness.
2
1
1
Install the mounting plates to the
machine.
4
4
1
1
8
Install the backhoe and the brackets
4
onto the machine.
2
14
14
1
1
1
1
1
3
Install the walkway.
3
1
2
1
1
1
1
2
Install the hand rail and the seat.
2
4
4
2
2
Install the stabilizers.
4
2
2
4
2
Install the stabilizer actuators and
hoses.
12
8
2
4
8
Use