Installing The Hand Rail And The Seat; Hand Rail; Seat; Flange Bolts (8 X 25 Mm) - Toro RT600 Operator's Manual

Heavy duty backhoe 125 traction unit
Hide thumbs Also See for RT600:
Table of Contents

Advertisement

3. Apply grease to the grease fitting.
Note: Use a lithium-base grease.
Note: Clean up any excess grease on the walkway
pivot with a rag.
4. Rotate the walkway clockwise until the hole in the
forward, horizontal flange of the walkway is aligned
with the hole in the horizontal flange of the walkway
support bracket
(Figure
Note: Raise or lower the pivot bracket as needed to
align the walkway with the walkway support bracket.
5. Tighten the bolts and nuts that secure the pivot support
bracket to the fuel-tank flange
6. Secure the walkway to the walkway support bracket
with the locking pin
6
Installing the Hand Rail and
the Seat
Parts needed for this procedure:
1

Hand rail

1

Seat

2

Flange bolts (8 x 25 mm)

2

Flange nuts (8 mm)

4

Bolts (5/16 x 7/8 inch)

4

Lock washer (5/16 inch)

Procedure
1. Align the holes in the bracket for the hand rail with the
holes in the seat post
16).
(Figure
16).
(Figure
16).
(Figure
17).
1. Seat post
2. Flange nut (8 mm)
3. Hand rail
4. Flange bolt (8 x 25 mm)
2. Secure the hand rail to the bracket of the seat post with
2 flange bolts (8 x 25 mm) and 2 flange nuts
3. Align the holes of the bottom of the seat with the holes
in the bracket on the seat arm
4. Apply medium-grade (service removable)
thread-locking compound to the 4 bolts (5/16 x 7/8
inch) from loose parts.
5. Secure the seat to the support of the seat post with 4
bolts (5/16 x 7/8 inch) and 4 lock washers; refer to
Figure
17.
15
Figure 17
5. Bolt—5/16 x 7/8 inch (4)
6. Lock washer (5/16 inch)
7. Seat support
8. Seat
(Figure
(Figure
17).
17).

Advertisement

Table of Contents
loading

This manual is also suitable for:

2543225432e

Table of Contents