Unpacking And Examining Delivery, Frame R5 And R6 - ABB ACS580 Series Hardware Manual

General purpose drives
Hide thumbs Also See for ACS580 Series:
Table of Contents

Advertisement

76 Mechanical installation

Unpacking and examining delivery, frame R5 and R6

The figure below shows the layout of the transport package. Examine that all items
are present and there are no signs of damage. Read the data on the type
designation label of the drive to make sure that the drive is of the correct type.
See section
Type designation label (page
9
2
8
1
Mounting template
2
Fixing brackets, 4 pcs
3
In the option box
• Europe: Quick installation and start-
up guide kit (6 languages)
• North America: Quick installation and
start-up guide
• Multilingual residual voltage warning
stickers
4
Cable box
Note: The cable box is mounted to the
IP55 drive module frame at the factory.
5
VCI bag for protecting against dust and
humidity
6
Cardboard box
7
Pallet
6
7
5
52).
3
10
11
1
4
8
Screw M5×25, 4 pcs
9
Straps
10
Control panel selected in the order (in
a separate package) in the option box
North America: Control panel factory
installed
11
Possible options in separate packages,
if they have been ordered with a plus
code, such as for example +K490 (FEIP-
21 Two-port EtherNet/IP adapter mod-
ule) in the option box.
North America: Options may be ordered
as factory installed.
Note: Hood included with option +B056
(IP55/UL Type 12) in North America
Note: Hardware and firmware manuals can
be ordered as a separate kit, see
ordering codes (page 57)
Manual kit

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs580-01 seriesAcs580-01-293a-4+j400

Table of Contents