Huawei V500R003C00 Maintenance Manual page 116

Smart modular data center
Table of Contents

Advertisement

FusionModule2000 Smart Modular Data Center
Maintenance Guide
Preparations
Figure 6-66 Positions of the eLight actuator and power supply
(1) AC actuator
Procedure
Step 1 Turn off the upstream AC input switch for the eLight power supply.
Step 2 Label each cable based on the corresponding ports on the eLight power supply.
Step 3 Remove the cables from the eLight power supply.
Step 4 Remove the old eLight power supply from guide rails.
Step 5 Install the spare eLight power supply in the original position and connect the cables.
Step 6 Turn on the upstream AC input switch for the eLight power supply.
----End
Issue 05 (2020-03-25)
Tools: ESD gloves, Phillips screwdriver, step ladder, label, marker
Material: eLight power supply
(2) eLight actuator
Copyright © Huawei Technologies Co., Ltd.
6 Parts Replacement
(3) eLight power supply
109