Other Systems; Quarterly Maintenance - Huawei FusionModule1000A40 Maintenance Manual

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A40:
Table of Contents

Advertisement

FusionModule1000A40 Prefabricated All-in-One
Data Center
Maintenance Guide

3.4.6 Other Systems

Table 3-8 Monthly maintenance checklist for other systems
Item
Method
Pre-fab.
Check the pre-fab.
module
module exterior for
repainting
damage or corrosion.
External
Check whether
environment
hazards or potential
of pre-fab.
hazards exist around
modules
the pre-fab. modules.
Check whether
obvious rubbish
exists around the
pre-fab. modules.
Check whether the
ambient
temperature,
humidity, and solar
radiation outside the
pre-fab. modules
meet requirements.

3.5 Quarterly Maintenance

Issue 04 (2021-02-10)
Check Standard
The pre-fab.
module and
bases are free
from paint
flake-off, rust, or
corrosion.
No hazard or
potential hazard
exists around
the pre-fab.
modules.
No obvious
rubbish exists
around the pre-
fab. modules.
The external
temperature and
solar radiation
requirements of
the
FusionModule10
00 are as
follows:
● Temperature:
– Normal
temperatu
re: –20°C
to +55°C
– Low
temperatu
re: –40°C
to +45°C
● Humidity:
5%–95% RH
● Solar
radiation: ≤
1120 W/m
Copyright © Huawei Technologies Co., Ltd.
Troubleshooting
Maintain or replace the rusty or
damaged part of the pre-fab. modules.
Repaint areas with paint flake-off or
rust.
Take measures to handle potential
hazards.
Clean the rubbish.
For details, contact Huawei technical
support.
2
3 Routine Maintenance
24