Step 12 Move the smart cooling product.
Steel plates and pipes must be placed a certain distance away from the pre-fab.
module side wall to prevent scratching the side wall.
1.
2.
3.
Issue 04 (2021-02-10)
Figure 5-17 Cutting pipes
(1) Cutting points on smart cooling product pipes
NO TICE
Take the fittings for moving the smart cooling product from the pre-fab.
module fitting bag.
NO TE
The fittings required for moving the smart cooling product include one 3 mm thick
steel plate and five 0.5 m long DN32 steel pipes.
Place the 3 mm thick steel plate on the raised floor in the cold aisle.
Place two 0.5 m long steel pipes on the steel plate.
Copyright © Huawei Technologies Co., Ltd.