HUAWEI TP3106&TP3118&TP3118S
Commissioning Guide
2.1 Planning
To complete the deployment, ensure that all the tasks listed in
completed in order and all verification items are passed.
Figure 2-1 Deployment procedure
Table 2-1 Deployment tasks
Task
Pre-unpacking check
Unpack cases and cartons
Label cables
Issue 01 (2015-02-12)
2
Deployment Preparation
Description
Check the equipment cases.
Unpack the cases and
cartons, and check the goods
inside.
Sort and label the cables.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Deployment Preparation
Table 2-1
and
Figure 2-1
Remarks
XX cases in total. If any
abnormalities exist, confirm
the issue with the logistics
personnel.
There are 17 boxes
containing mechanical parts.
If any abnormalities exist,
confirm the issue with the
supply chain.
Sort and label the cables
according to the system
connection diagrams.
are
4