Setting Parameters; Commissioning Procedure - Huawei NetCol5000-C Series User Manual

Simple configuration in-row chilled water smart cooling product
Hide thumbs Also See for NetCol5000-C Series:
Table of Contents

Advertisement

NetCol5000-C030 In-row Chilled Water Smart Cooling
Product
User Manual (Simple Configuration)
Figure 5-1 Measuring the main power voltage
Step 2 Turn on the AC input switches from left to right.
----End

5.3 Setting Parameters

See

5.4 Commissioning Procedure

Context
Issue 09 (2020-01-10)
It is recommended that the AC input switches be turned on from left to right and turned off from
right to left.
(Applies to the NetCol5000-C030H6B2010020E1 and NetCol5000-C030H6B2010020E0) If the
green indicator is on
(Figure 3-38
the equipment. If the green indicator is off and the system is working properly, the secondary power
supply is serving the equipment.
4.3.2 Initial
Configuration.
Copyright © Huawei Technologies Co., Ltd.
shows the indicator position), the primary power supply is serving
5 Power-On Commissioning
133

Advertisement

Table of Contents
loading

Table of Contents