Huawei NetCol5000-C Series User Manual page 59

Simple configuration in-row chilled water smart cooling product
Hide thumbs Also See for NetCol5000-C Series:
Table of Contents

Advertisement

NetCol5000-C030 In-row Chilled Water Smart Cooling
Product
User Manual (Simple Configuration)
Figure 3-22 Installing the air baffle
Step 2 The procedure for securing the smart cooling product to a support is as follows:
1.
2.
3.
Figure 3-23 Securing the smart cooling product to the support
----End
Issue 09 (2020-01-10)
Place the smart cooling product on the support.
Measure the smart cooling product height using a measuring tape and level, and level the
smart cooling product by adjusting the anchor bolts under it using a wrench.
Install the adapter plate and air baffle. The four bolts connecting the adapter plate and
support are M12 and the required torque is 50 N· m. The four bolts connecting the air
baffle and cabinet are M10 and the required torque is 30 N· m.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
50

Advertisement

Table of Contents
loading

Table of Contents