Item
Monitori
ng
Electric
heater
Compon
ents
inside
the
electric
control
box
(Remove
the
electric
Issue 01 (2019-03-05)
Method
Check Standard
Export air
N/A
conditioner
logs, alarms,
temperature,
humidity, the
operating
status of the
compressor,
fan, electric
heater, electric
humidifier, and
water pump,
and time from
the monitoring
system. View
the historical
alarms
generated in
this quarter and
select the most
common five
ones (skip this
step if no
monitoring
system is
configured).
The electric
The electric heater is
heater is
securely installed.
secure.
Check that the
The electric heater surface is
electric heater
not corroded.
surfaces are
not eroded.
Check that all
Switches and fuses are
circuit breakers
working properly.
and fuses work
properly.
Check that the
Cables are securely
cable
connected.
connection is
secure and
correct.
Copyright © Huawei Technologies Co., Ltd.
3 Routine Maintenance
Troubleshooting
Rectify the fault or contact
Huawei technical support.
Secure the electric heater and
switch.
Replace the electric heater if
its surface is eroded.
Replace faulty circuit
breakers and fuses.
Secure loose cables.