DBS3900 (ICR)
Installation Guide
About This Chapter
This chapter lists the tools and instruments that must be obtained before the installation, and it
also specifies the skills that the engineering personnel must have.
2.1 Reference Documents
This section describes the documents that you need to obtain before performing the installation.
2.2 Tools and Instruments
This section lists the tools and instruments that must be obtained before the installation.
2.3 Skills and Requirements for Onsite Personnel
Onsite personnel must be qualified and trained. Before performing any operation, onsite
personnel must be familiar with correct operation methods and safety precautions.
Issue 12 (2015-04-30)
2
Installation Preparations
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2 Installation Preparations
6