Figure 15-46 Installing the CPRI optical cable (1)
Figure 15-47 Installing the CPRI optical cable (2)
Step 3 Route the cables along the right side of the cabinet according to the instructions in
Requirements, and use cable ties to bind the cables.
Issue 12 (2015-04-30)
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15 Installing Cables
15.1 Cabling