Huawei DBS3900 Installation Manual page 142

Icr dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (ICR)
Installation Guide
Issue 12 (2015-04-30)
Figure 15-30 Wrapping the waterproof tape and insulation tape
(1) Waterproof tape
(4) Power cable
NOTICE
Trim off surplus part of the cable ties at the position 3 mm (0.12 in.) to 5 mm
(0.20 in.) away from the head of the cable tie.
4.
Connect one end of the RRU power cable to the AC power port at the bottom of the
AC RRU, as shown in
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(2) Insulation tape
(5) PGND cable
Figure
15-31.
15 Installing Cables
(3) Cable tie
-
137

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents