Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Chapter 1 Installation Preparations
This chapter introduces the preparations before BTS3606A installation from the
following aspects:
Project Files
Tools and Instruments
Installation Conditions
Unpacking
1.1 Project Files
Table 1-1 lists the technical documents useful for the hardware installation.
Table 1-1 Technical documents
Document
type
Installation
guide
Product
manual
Other related
documentation
Document name
Network planning,
construction drawings,
cable connections
Site survey report
Engineering design and
construction drawings
BTS3606A CDMA
Outdoor Base Station
Installation Customer
Preparation Instruction
Airbridge
BTS3606&3606A
CDMA Base Station
Installation Manual
Contract
List of equipment
configurations
Delivery list
Huawei Technologies Proprietary
1-1
Chapter 1 Installation Preparations
Description
The design unit appointed by the
customer must prepare the documents.
The customers must provide a copy of
the documents to Huawei prior to the
equipment delivery.
The report is filled in by Huawei survey
engineers during site survey.
The document is prepared by Huawei
Construction Design Department
according to the equipment
configuration of a site. It is delivered to
the site with the equipment.
The document guides the customer to
make preparations before cabinet
installation.
The document must be provided by
Huawei in the delivery.
The document must be provided by
Huawei in the delivery.