Cable Installation Process - Huawei DBS3900 Installation Manual

Icr dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (ICR)
Installation Guide
Table 15-4 Cable description
No.
P1
P2
P3
P4

15.3 Cable Installation Process

This section describes the process of installing ICR cables.
Cable Installation Process
Figure 15-12
Issue 12 (2015-04-30)
Cable
One End
Connecto
r
External
OT
input power
terminal
cable
DCDU
OT
power cable
terminal
PSU in-
RJ45
position
connector
signal cable
PSU
Cord end
monitoring
terminal
signal cable
shows the cable installation process.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
One End
Installation
Connector Installation
Position
Power input
-
wiring
terminal for
the DC/DC
power device
RTN(+) and
OT
NEG(-)
terminal
terminals on
the DCDU
PRESENT
RJ45
port on the DC/
connector
DC power
device
ALM port on
RJ45
the DC/DC
connector
power device
15 Installing Cables
Position
External power
equipment
RTN(+) and
LOAD(-)
terminals on the
DC/DC power
device
EXT-ALM1 port
on the UPEU
EXT-ALM0 port
on the UPEU
119