Huawei DBS3900 Installation Manual page 94

Icr dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (ICR)
Installation Guide
1.
2.
3.
Figure 12-1 Installing a PGND cable and an equipotential cable
(1) Ground bar 1
Step 4 Lay out the cables according to the instructions in
ties to bind the cables.
Step 5 Label the installed cables according to the instructions in Attaching a Cable-Tying Label.
----End
Issue 12 (2015-04-30)
Connect one end of the PGND cable to ground bar 2 on the IFS06.
Connect one end of the equipotential cable to ground bar 1 on the IFS06 and the other end
to the ground bar on the upper IMB03.
Connect one end of the equipotential cable to the ground bar on the upper IMB03 and the
other end to the ground bar on the lower IMB03.
(2) Ground bar 2
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
12 Installing the Equipotential Cable and PGND Cable
(3) Lower IMB03
15.1 Cabling
Requirements, and use cable
(4) Upper IMB03
89

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents