Installing The Gps Clock Signal Cable - Huawei DBS3900 Installation Manual

Icr dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (ICR)
Installation Guide
Figure 15-49 Installing the RF jumper for an AC RRU
Step 2 Connect the other end of the RF jumper to the feeder or antenna.
Step 3 Route the RF jumper along the right side of the cabinet according to the instructions in
Cabling
Step 4 Label the installed RF jumper according to the instructions in Attaching a Sign Plate Label.
Step 5 Apply color-coding to the installed RF jumper according to the instructions in Attaching the
Color Ring.
----End

15.14 Installing the GPS Clock Signal Cable

This section describes the procedure and precautions for installing a GPS clock signal cable.
Context
Procedure
Step 1 Put on an ESD wrist strap or a pair of ESD gloves.
Issue 12 (2015-04-30)
Requirements, and use cable ties to bind the RF jumper.
NOTE
A satellite card needs to be installed onsite only for a USCU that supports the dual-satellite mode.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15 Installing Cables
15.1
152