Table Of Contents - Huawei DBS3900 Installation Manual

Icr dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (ICR)
Installation Guide
Contents
Contents
About This Document.....................................................................................................................ii
1 Changes in the DBS3900 (ICR) Installation Guide.................................................................1
2 Installation Preparations..............................................................................................................6
2.1 Reference Documents.....................................................................................................................................................7
2.2 Tools and Instruments....................................................................................................................................................7
2.3 Skills and Requirements for Onsite Personnel...............................................................................................................8
3 Information to Be Known Before the Installation..................................................................9
3.1 Introduction to the Equipment......................................................................................................................................10
3.2 Installation Scenarios....................................................................................................................................................13
3.2.1 Installation Scenarios.................................................................................................................................................13
3.2.2 Height-Restricted Scenarios......................................................................................................................................15
3.2.3 Height-Unrestricted Scenarios...................................................................................................................................26
3.3 Requirements for Dimensions and Clearances.............................................................................................................42
4 Unpacking the Equipment.........................................................................................................50
5 Obtaining the ESN......................................................................................................................52
6 Installation Process.....................................................................................................................54
7 Assembling the IFS06.................................................................................................................56
8 Installing the IFS06.....................................................................................................................61
8.1 Installing the IFS06 on the Concrete Floor..................................................................................................................62
8.2 Installing the IFS06 on the ESD Floor.........................................................................................................................65
9 Installing the Main Brackets for RRUs...................................................................................70
9.1 Introduction to the Bracket Assembly..........................................................................................................................71
9.2 Installing the Main Brackets for DC RRUs..................................................................................................................72
9.3 Installing the Main Brackets for AC RRUs..................................................................................................................74
10 Installing the GPS Surge Protector........................................................................................77
11 Installing the IMB03.................................................................................................................80
11.1 Installing the Upper IMB03 Independently................................................................................................................81
11.2 Installing the Lower IMB03 Independently...............................................................................................................82
Issue 12 (2015-04-30)
Huawei Proprietary and Confidential
iii
Copyright © Huawei Technologies Co., Ltd.

Advertisement

Table of Contents
loading

Table of Contents