DBS3900 (ICR)
Installation Guide
2.1 Reference Documents
This section describes the documents that you need to obtain before performing the installation.
l
l
2.2 Tools and Instruments
This section lists the tools and instruments that must be obtained before the installation.
Marker
Adjustable wrench (size ≤ 19
mm or 0.75 in.)
Torque screwdriver
Rubber mallet
Issue 12 (2015-04-30)
Before the installation, familiarize yourself with related information in the following
documents:
– BBU3900 Hardware Description
– For how to install RRUs, see the related RRU installation guide.
– Safety Precautions
During the installation, familiarize yourself with related information in the following
document:
– Installation Reference
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Phillips screwdriver (M4,
M5, M6, M8)
Flat-head screwdriver (M4,
M5, M6, M8)
Socket wrench (M10, M12)
COAX crimping tool
Utility knife
2 Installation Preparations
Diagonal pliers
Torque socket (30 N·m to 50
N·m or 265.52 lbf·in. to
442.54 lbf·in.)
Wire clippers
Wire stripper
7