Step 7 Lay out the cable according to the instructions in
ties to bind the cable.
Step 8 Label the installed cable according to the instructions in Attaching a Sign Plate Label.
----End
Issue 12 (2015-04-30)
Figure 15-53 Installing the GPS jumper
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15.1 Cabling
Requirements, and use cable
15 Installing Cables
156