Installing The Gps Surge Protector - Huawei DBS3900 Installation Manual

Icr dual-mode base station
Hide thumbs Also See for DBS3900:
Table of Contents

Advertisement

DBS3900 (ICR)
Installation Guide
10
This chapter describes the procedure for installing the GPS surge protector.
Context
Two types of GPS surge protector can be installed on the IFS06, as shown in
Figure 10-1 GPS surge protector
(1) GPS surge protector A
Procedure
Step 1 Remove the nut and toothed washer from the type N female connector of the GPS clock signal
cable, as shown in
Issue 12 (2015-04-30)

Installing the GPS Surge Protector

NOTE
l One or two GPS surge protectors can be installed on the IFS06, depending on the onsite requirements.
l GPS surge protector A does not require a PGND cable.
Figure
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
(2) GPS surge protector B
10-2.
10 Installing the GPS Surge Protector
Figure
10-1.
77

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents