Quick installation and commissioning flowchart

Identify the frame size of your drive: R0...R2.
Plan the installation: select the cables, etc.
Check the ambient conditions, ratings and required
cooling air flow.
Unpack and check the drive.
If the drive is connected to an IT (ungrounded) or
corner-grounded system, check that the internal EMC
filter is not connected.
Install the drive on a wall or in a cabinet.
Route the cables.
Check the insulation of the input cable and the motor
and the motor cable.
Connect the power cables.
Connect the control cables.
Check the installation.
Commission the drive.
Task
See
Operation principle and hardware description:
Type designation key
on page
Technical
data:
Ratings
on page
Planning the electrical installation
Technical data
on page
137
Mechanical
installation:
Unpacking
Operation principle and hardware
Type designation key
on page
installation:
Checking the compatibility with IT
(ungrounded) and corner-grounded TN
systems
on page
40
Mechanical installation
on page
Planning the electrical
installation:
cables
on page
34
Electrical
installation:
Checking the insulation of
the assembly
on page
39
Electrical
installation:
Connecting the power
cables
on page
41
Electrical
installation:
Connecting the control
cables
on page
44
Installation checklist
on page
Start-up and control with I/O
Introduction to the manual
17
22
137
on page
29
on page
24
description:
22 Electrical
23
Routing the
49
on page
51

Advertisement

Table of Contents
loading

Table of Contents