4. Digital signals: Strip the outer insulation of the digital signal cable 360 degrees
and ground the bare shield under the clamp.
5. Connect the conductors of the cable to the appropriate terminals.
6. Twist the grounding conductors of the used pairs in the digital signal cable
together and connect the bundle to the SCR terminal.
7. Secure all analog and digital signal cables outside the drive mechanically.
Electrical installation
5
6
Tightening torque for:
- input signals
4
0.22 N·m / 2 lbf·in
- relay outputs
0.5 N·m / 4.4 lbf·in