Installing Dell T320 Server And Connecting Cables; Honeywell Server Back Panel Connections - Honeywell T320 Planning, Installation And Service Manual

Table of Contents

Advertisement

Height option
1U
2U
3U
4U
3.4

Installing Dell T320 server and connecting cables

This section describes the procedure for installing and cabling the server in either 800 or 1000
millimeter (mm) deep LCN cabinets, model number MP-C8LCB1-Tab and MP-C1MCB1-Tab
respectively. This procedure assumes that a new 800 or 1000 mm deep cabinet was shipped from the
Honeywell factory with either the "fixed rail" mounting kit, model number TP-SPCMF1, or the "slide tray"
mounting kit, model number TP-SPCMS1, pre-installed.
NOTE
A Local Control Network Processor (LCNP) board and LCN Media Access Unit (MAU) are no
longer used if the Server has been upgraded to be an ELCN node.

Honeywell server back panel connections

l
Installing the server using the fixed rail mounting kit model TP-SPCMF1
l
Installing the server using the slide tray mounting kit model TP-SPCMS1
l
Connecting the cables
l
Install air duct baffles and blank panel front covers in cabinet
l
3.4.1
Honeywell server back panel connections
The figure in this section illustrates the back panel of the server and identifies the connectors for all
devices. It also shows an LCNP4e/LCNP4e2 card installed. Your configuration may not include these
cards.
Part
Blank front panel
Air duct baffle
Blank front panel
Air duct baffle
Blank front panel
Air duct baffle
Blank front panel
Air duct baffle
Part number
51201248
51303521
51201248
51303521
51201248
51303521
51201248
51303521
- 32 -
Chapter 3 - Installation
Tab number
-100
-100
-200
-200
-300
-300
-400
-400

Advertisement

Table of Contents
loading

Table of Contents