Installing Dell T130 Server And Connecting Cables; Honeywell Server Back Panel Connections - Honeywell MZ-PCSV74 Planning, Installation And Service Manual

Table of Contents

Advertisement

Height option
1U
2U
3U
4U
3.4

Installing Dell T130 server and connecting cables

This section describes the procedure for installing and cabling the server in either 800 or 1000
millimeter (mm) deep LCN cabinets, model number MP-C8LCB1-Tab and MP-C1MCB1-Tab
respectively. This procedure assumes that a new 800 or 1000 mm deep cabinet was shipped from the
Honeywell factory with either the "fixed rail" mounting kit, model number TP-SPCMF1, or the "slide tray"
mounting kit, model number TP-SPCMS1, pre-installed.
Honeywell_server_back_panel_connections_T130.html#Honeywell_server_back_panel_
l
connections_T130
Connecting the cables
l
3.4.1

Honeywell server back panel connections

The figure in this section illustrates the back panel of the server and identifies the connectors for all
devices.
Part
Blank front panel
Air duct baffle
Blank front panel
Air duct baffle
Blank front panel
Air duct baffle
Blank front panel
Air duct baffle
Part number
51201248
51303521
51201248
51303521
51201248
51303521
51201248
51303521
- 25 -
Chapter 3 - Installation
Tab number
-100
-100
-200
-200
-300
-300
-400
-400

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents