Installing The Server And Connecting The Cables; Honeywell Server Back Panel Connections; Installing The Server - Honeywell HP ProLiant DL360P Gen8 Service Manual

Table of Contents

Advertisement

Height option
1U
2U
3U
4U
3.4

Installing the server and connecting the cables

This section describes the procedures for installing and cabling the server in a one-meter deep
Honeywell cabinet with model number MP-C1MCB1. This procedure assumes that a new one-meter
deep equipment cabinet, Honeywell model number MP-C1MCB1, was shipped from the Honeywell
factory with pre-assembled "Sliding Ready Rails". The Sliding Ready Rails II kit and 1U Cable
Management Arm kit are included with the purchase of Honeywell part number 51155539-100 (Model
No. MZ-PCSV82).

Honeywell server back panel connections

l

Installing the server

l
Connecting the cables
l
Install air duct baffles and blank panel front covers in cabinet
l
3.4.1
Honeywell server back panel connections
The figure in this section illustrates the back panel of the server and identifies the connectors for all
devices. It also shows an LCNP4e/LCNp4e2 card installed. Your configuration may not include these
cards.
NOTE
The photo shows the MAU connector attached to the server back panel. The LCN MAU is not
used when the LCN is integrated with an ELCN.
3.4.2
Installing the server
To install the server
Part
Blank front panel
Air duct baffle
Blank front panel
Air duct baffle
Blank front panel
Air duct baffle
Blank front panel
Air duct baffle
Part number
51201248
51303521
51201248
51303521
51201248
51303521
51201248
51303521
- 28 -
Chapter 3 - Installation
Tab number
-100
-100
-200
-200
-300
-300
-400
-400

Advertisement

Table of Contents
loading

Table of Contents