Installing Instructions; Connecting External Power; Mounting Hus-D4-E-Pro; Network Connecting - Honeywell HUS-D4-E-Pro User Manual

Four channels high definition network video process server
Table of Contents

Advertisement

Hot plugging monitors is not supported. Shut
down the decoder before connecting or detaching
the connector of the monitor.

Installing Instructions

Connecting External Power

Please use the 110-240V AC power.

Mounting HUS-D4-E-Pro

With 2U/4U chassis, HUS-D4-E-Pro can be mounted in standard
cabinet.

Network Connecting

HUS-D4-E-Pros can be connected to LAN and WAN. Make sure
that the bandwidth is wide enough when connecting to network
(it is recommended to connect the video device through Gigabit
Ethernet switch). A switch (not a hub) is recommended when
setting up an LAN. Long-distance wiring should be avoided.
Please select right bandwidth when connecting them to WAN.
Make the wire in terms of specifications for
category 5 cable.
Products with this label should only be used
safely in areas with an altitude of 2000 meters or
below.
Installation and Operation
9

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents