Maintenance; Maintenance Schedule - ABB PCS100 AVC-20 User Manual

Active voltage conditioner
Table of Contents

Advertisement

PCS100 AVC-20 User Manual

12 MAINTENANCE

The PCS100 AVC-20 has been designed for ease of maintenance.
DANGER
This manual does not provide sufficient information for safe service of the PCS100 AVC-20. For
such service information refer to appropriate manual.
Maintenance must be carried out by suitably trained staff. The equipment must be de-energized and allowed to
discharge before beginning inspections.

12.1 Maintenance Schedule

Recommended maintenance intervals and component replacements are based on specified operational and
environmental conditions. ABB recommends product inspections according to list below to ensure the highest
reliability and optimum performance. More detailed maintenance information can be found in the product
manuals and detailed maintenance instructions.
For more information consult ABB Service:
Legend
R
Replacement of component
I
Inspection (visual inspection, correction and replacement if needed)
S
On-Site work (tests, measurements, etc.)
Recommended maintenance actions
Cooling
Air ducts
All fans
Connections and surroundings
Thermal scan
Tightness of terminals
Dust, corrosion and temperature
Communications cables and connections
Aging
AC filter capacitors
Spare Parts
Spare parts
PCS100 power module DC bus capacitor reforming
Improvements
Software upgrades
Note:
For critical applications and applications where there is the possibility of poor environmental conditions
it is recommended to shorten the above recommended periods.
NZ-powerconditioningservice@abb.com
Activity
Period
I
1 year
I
1 year
I
1 year
I
5 year
I
1 year
I
1 year
S
1 year
I
1 year
I
3 years
I
1 year
99

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pcs100 avc-40

Table of Contents