PCS100 AVC-20 User Manual
Utility voltage
3-phase
Utility Supply
Utility voltage
3-phase
Utility Supply
Figure 2-4: PCS100 AVC-20 Energy Flow in case of utility supply equal to nominal level
2.1.2

Internal Bypass Operation

In the case of an external overload or internal fault condition the internal bypass circuit will shunt the inverter side
of the injection transformer, bypassing the inverter and effectively providing a direct connection from the utility
supply to the output, without interruption to the load.
PCS100 AVC-20
regulation voltage
Bypass OPEN
PCS100 AVC-20
regulation voltage
Bypass OPEN
Load voltage
3-phase
Load
Load voltage
3-phase
Load