NetCol5000-C(030, 032, 065) In-row Chilled Water
Smart Cooling Product
User Manual
6.4.10 Replacing a Main Control Board
Prerequisites
●
●
Context
Preparation: Maintain from the rear door with power-off.
Procedure
Step 1 Tap Shutdown on the home screen of the display module.
Exercise caution because the device is still energized after it is shut down on the
screen of the display module.
Step 2 Open the rear door and remove the air filter.
Step 3 Remove the cover of the electric control box. For details, see
Step 4 Remove the six screws from both sides of the main control board.
Figure 6-17 Replacing the main control board (NetCol5000-C065)
Issue 04 (2021-03-15)
A main control board needs to be replaced.
A spare and functional main control board is available.
NO TICE
Copyright © Huawei Technologies Co., Ltd.
6 System Operation and Maintenance
Step
2.
168