Outboard Rigging Guide - 2001
PREPARATION OF INSTALLATION
1.
Attaching
the
marks
Connect the cables in the following sequence
as illustrated below.
NOTE:
Before connecting the cable, be sure to move
the shift levers on the remote control box and
the engine to neutral.
cable
identification
10B-25