Yamaha T8 Rigging Manual page 367

Hide thumbs Also See for T8:
Table of Contents

Advertisement

Outboard Rigging Guide - 2001
3. Install:
• Bushing
22
• Shift Lever
20
• Screw
21
Screw
Tightening Torque:
21
3.5 Nm (0.35 m•kg)
4. Install:
• Cable Clamp 4
• Spring Pin 5
• Remote Control Bracket 3
• Bolt 6
• Nut 7
Bolt 6 6 Tightening Torque:
8 Nm (0.8 m•kg)
19
14
13
18
6
2 1
2 0
2 2
4
12
15
12
11
16
17
17
16
242
5
3
7
9.9/15 (2-Stroke) Remote Control Attach. Kit
Clamp Bracket Bolt
1. Replace:
• Clamp Bracket Bolt
Nut a a Tightening Torque:
13 Nm (1.3 m•kg)
a
Remote Control Cable
1. Install:
• Cable End 8
2. Connect:
• Shift Cable a
• Throttle Cable b
• Cable End 8
• Plane Washer
• Clip 9
9
8
18
9
10
7-6
23
2 3
10
3
2 0
8
8
b

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents