Yamaha T8 Rigging Manual page 331

Hide thumbs Also See for T8:
Table of Contents

Advertisement

Outboard Rigging Guide - 2001
Tiller Handle
1. Remove the steering hook 1.
N O T E :
The removed nut should be used for the
handle installation, so keep it for the installation.
2. Install the tiller handle assembly 1 and nut
2.
T orque: N ut - 40N m ( 4.0 m-kg, 2 9 ft-lb.)
3. Install the following:
1 Grommet
2 Shift Cable
3 Throttle Cable
4 Battery Cable
5 Extension Wire Harness
6 Main Switch Harness
7 Power Trim/Tilt Switch Leads
N O T E :
Align the taped end
and the extension wire harness with the end of the
grommet.
a
of the battery cable
6-51
4. Install the cable clamp 1.
5. Install the fitting plate 1 and bolt 2.
2 2
N O T E :
After securing the fitting plate, lift the
tiller handle straight up and check that the cables
and wires are not stretched.
T orque: N ut - 8N m ( 0.8m-kg, 5.8ft-lb)
C90/90 Tiller Handle &
Steering Friction Kit

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents