Figure 3-49 Dual-row aisle containment, crossing rows (2N/N+1 scenario)
----End

3.5 Verifying the Installation

No.
1
2
3
4
5
6
7
Issue 05 (2020-10-15)
Check Item
Screws are tightened properly.
The connective kit is in close contact with the copper
bar of the busbar trunking unit.
The hook on the power distribution unit is flipped on.
The end plug is installed.
Load cables are connected correctly. Power cables are
reliably separated from signal cables.
There is no foreign matter such as redundant cable
ties, paper, and packing materials left around the new
main way.
Check that circuit breaker labels are correct, clear,
complete, and attached properly.
Copyright © Huawei Technologies Co., Ltd.
3 Installation
Check Result
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
□Passed □Failed
42