Installation Guide; Site Requirements; Installation Preparations; Obtaining Technical Documents - Huawei PDU8000 Series User Manual

Modular precision pdc v2.0
Hide thumbs Also See for PDU8000 Series:
Table of Contents

Advertisement

PDU8000 Modular Precision PDC V2.0
User Manual

5.1 Site Requirements

The PDC site requirements are as follows:

5.2 Installation Preparations

Before installation, unpack and check the product, make available all required technical
documents, tools, and materials, check the installation environment, and train onsite
installation personnel.

5.2.1 Obtaining Technical Documents

Table 5-1 Technical documents
Technical Document
Schematic diagram
Issue 03 (2018-01-25)
Far away from dust, smoke, harmful gas, and corrosive, flammable, or explosive objects.
Free of interference from strong electromagnetic fields.
Cabling space should be planned for the site, and cable ladders and cable trays should be
designed for the PDC installation position.
The error of the installation platform levelness must be less than 10 mm.
Meets the PDC input rating requirements (see the Schematic Diagram delivered with the
product for details).
Temperature: -5° C to +40° C
Relative humidity: 5%-95% RH, non-condensing
Altitude: < 2000 m (derated when the altitude exceeds 2000 m). For the derating details,
contact Huawei technical support.
Huawei will not be liable for any consequences caused if the installation environment does not meet the
requirements.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5

Installation Guide

Function
Shows the circuit breaker
control relationship in the
PDC.
5 Installation Guide
Obtaining Method
Delivered with the product.
30

Advertisement

Table of Contents
loading

Table of Contents