Huawei New Main Way 2.0 User Manual page 44

Table of Contents

Advertisement

New Main Way 2.0
User Manual
Step 5 Install load cables.
1.
2.
3.
4.
5.
6.
● When a cable terminal is connected in place, you will hear a click.
● You need to install a ring buckle to fasten the cable terminal.
● If not prefabricated, the cables from the power distribution unit to the cabinet
Table 3-5 Load cable silk screen
Output Connector
XT1
XT2
XT3
Issue 05 (2020-10-15)
Remove the protective cover from the load wiring port.
Remove the ring buckle.
Press the front part of the round connector backwards and insert the
connector into the load wiring port.
Check the insertion depth of the round connector. Ensure that the red line is
not visible.
Reinstall the ring buckle.
Check whether the round connector is securely installed. You can slightly pull
the connector to check whether it is loose. If it is loose, install it again.
NO TICE
rPDU need to be prepared onsite. For details, see the appendix
Load
Cables.
Copyright © Huawei Technologies Co., Ltd.
Single-Phase Power
Distribution Unit
QF1
QF2
QF3
QF4
QF5
QF6
3 Installation
A Preparing
Three-Phase Power
Distribution Unit
QF1
QF2
-
38