Huawei New Main Way 2.0 User Manual page 45

Table of Contents

Advertisement

New Main Way 2.0
User Manual
Figure 3-43 Installing load cables
(1) Ring buckle
Step 6 Install cascade cables.
If a 48 V cascading cable needs to be prepared onsite, ensure that the wire with a
red tube is inserted into the terminal pin marked in red and the wire with a black
tube is inserted into the terminal pin marked in blue.
Issue 05 (2020-10-15)
NO TICE
Copyright © Huawei Technologies Co., Ltd.
(2) Spring buckle
3 Installation
(3) Red line
39

Advertisement

Table of Contents
loading

Table of Contents